Thames Water Build over Agreements require different information that must be provided to a thames water engineer before construction. We saw a case where the owner assumed that the contractor had handled the Thames Water Build over Agreement, while the contractor assumed it was the owner. This confusion resulted in a four-week delay in the work, while location studies were conducted, plans were drawn up and Thames Water Engineer visited the website. We advise you to divert pipes around planned buildings or extensions. If you can`t, then channel all the pipes and fittings under the building, so that they can be accessed for repairs. If any of the works are found outside your borders, please see the work near our pipes. Any nearby pipeline you want to build in could have an impact on the design, so it`s best to know where the pipes are when you plan to avoid delays and additional costs. If you`re not sure how you`re going to do it, we`re here to help. More information about the assigned and unassigned tubes can be found below.

If your answers meet our requirements, we will send you an agreement. If not, we will re-educate you to apply for an approved construction agreement that you should pay. There is a discount to pay online. The absence or ignorance of a Thames Water construction could result in significant project delays, as existing construction can only begin when it is in effect. It is therefore essential to ensure that this is taken into account in the project`s calculations and on time. So what is a public channel or a flow, to simplify, a channel that serves more than one property enters the scope of a thames Water Build over Agreement. As well as a flow and, in particular, the point where the drain pipe crosses the border from one property to another. A Thames Water Build over Agreement is a quality label for proposed work and will generally be required for all excavation work within 3 metres of a public canal or flow. Wells also cannot be built because of the increased risk of flooding and olfactory nuisance caused by internal wells.

Where possible, wells should be removed and crossed. If it is not possible to build a well outside a building, we can discuss alternatives when we receive your application. If pipes are located near the building you want to build in, this could have an impact on the design of the building. In addition to reviewing the municipality`s building rules, it is important that you work with us to ensure that the pipes are protected and that our access to the municipality is not restricted. Nor will we allow pumps, superstructures or remote channels to be built. If no construction agreement has been reached, the vendor should have a sewer line review and the records forward to the water company. If the water company is satisfied that the sewers are in good condition, they will give a consolation letter confirming that the sewers are in satisfactory condition. The comfort letter generally satisfies the buyer and its mortgage lender that the Water Company will not take any action to demolish the insulting structure over the public sewers. Without our agreement, your local authority may not provide a certificate of compliance. This can cause problems if you are trying to sell your property, as a buyer`s lawyer could tell them that the building has been enlarged without our permission above or near a canal. The other possibility is that the seller will provide the buyer with compensation insurance to protect against financial losses resulting from the construction of the property through a public sewer.

It is the fastest and cheapest option, but whether or not insurance is available depends on the circumstances of each case. We may need to do additional research for sewers larger than 375 mm in diameter. This may be the case p